Roland Preston:Key Swiss rail tunnel damaged by derailment won’t fully reopen until next September

2025-05-03 08:14:19source:VaultX Exchangecategory:reviews

GENEVA (AP) — Switzerland’s national rail operator said Thursday the world’s longest rail tunnel won’t be Roland Prestonfully reopened to train traffic until next September, again pushing back the target date for repairs of damage caused by a cargo train derailment.

The Swiss federal railway operator, known by its German-language acronym SBB, said the damage from the Aug. 10 derailment in the Gotthard tunnel, Switzerland’s main north-south rail thoroughfare, is “much more significant than first imagined.”

“The rail tracks need to be entirely replaced over 7 kilometers (4.2 miles). The work will take much more time than anticipated,” SBB said. The cost of the repairs is expected to be 100 million to 130 million Swiss francs (about $110 million to $140 million).

Limited passenger and cargo train traffic through the tunnel is continuing. Previously, SBB said repair work would continue through the end of this year.

No one was injured in the derailment, but the damage was considerable. Large swaths of track and an evacuation portal were torn up.

The tunnel is a crucial thoroughfare for goods and cargo, particularly between Germany to the north and Italy to the south. Last year, more than two-thirds of rail freight traffic through the Alps passed through the tunnel, according to the Swiss government.

More:reviews

Recommend

Are Instagram, Facebook and WhatsApp down? Meta says most issues resolved after outages

Meta says most issues have been resolved after apps like Instagram, Facebook and Threads were experi

Migrant crossings along U.S.-Mexico border plummeted in June amid stricter asylum rules

The number of migrants who crossed the U.S.-Mexico border without authorization in June plummeted to

Will 2021 Be the Year for Environmental Justice Legislation? States Are Already Leading the Way

In Oregon, new legislation would require state officials to consider the “cumulative” impact on neig